Saudi Halal Expo 2024

Exhibit Rules

Build Up

Day

Date

Time

Saturday

26 Oct 2024

12:00 AM

Sunday

27 Oct 2024

4:00 PM

Break Down

Day

Date

Time

Wednesday

30 Oct 2024

10:00 PM

Thuresday

31 Oct 2024

10:00 AM

Important Note

I would like to remind you of the importance of properly removing all waste materials from the site. It is the responsibility of each exhibitor to ensure that everything is cleared away at the end of both the buildup and breakdown periods. This includes any waste left by your appointed contractor, as well as all, stand-fitting materials such as graphics, flooring, carpet/carpet tape, and packaging materials.

Please note that waste removal services are not available onsite. Therefore, it is the responsibility of each contractor to remove all work waste materials during and after the breakdown. Please be aware that general waste bins and skips are not provided within the halls.

Failure to remove installations and stand materials within the published time limits or disposing of them in an unauthorized manner at the venue will result in a waste disposal fee. This fee will be charged directly to the exhibitor in order to cover the cost of appropriate disposal.

Booth Build

1. Shell scheme

The official stand builder of the Shell scheme is Modern Line

The shell scheme will include the following items:

2. Stand build (Space Only)

Booth Structure

1. Two Floor Structure (Double Deck)

Such stands may be built to a maximum height of 6 meters (including any name sign or trademark) Double decker stand construction is only permitted on Island sites

Double decker design submission guidelines:

Staircases

Other Services

1. Rigging

ensure compliance with workplace regulations, all rigging must receive approval from the engineering office prior to seeking organizer approval. This step is crucial in maintaining safety standards and ensuring a smooth workflow.

2. Hight Grading System

For space-only stands, the maximum heights for walls, display materials, etc must not exceed 4m.

A minimum of 2m from the perimeter of the stand Located as centrally as possible within the stand.

For shall scheme stands, the maximum height is 3m.

STAND WEIGHT: The hall floor is epoxy coated-screed. The maximum permissible load-bearing capacity is: 3000kg/sq